It’s Bond Season and Sweater Weather! (Part 2)

Design on Occupied Sites & Alternate Project Delivery Methods

In Part 2, we’ll be discussing the roll of design on occupied sites and project delivery methods. So once again, grab yourself a latte, get cozy, and we’ll tell you a story about how Process can assist you with designing excellent, efficient, and equitable educational spaces economically.

Design on Occupied Sites

On occupied K-12 campuses, architects lay the critical groundwork during the design phase by embedding logistical flexibility directly into the contract documents. When an architect anticipates phasing, egress, and environmental control during design, they prevent costly change orders and ensure student safety. Contractors then handle the physical execution.

As designers, we must shift from a purely aesthetic mindset to a highly strategic, operational approach to assist with occupied sites.

Phasing as a Design Parameter

With occupied sites, we design the building footprint so it can be physically detached or partitioned into self-sustaining zones. This allows the contractor to build a new wing while the old wing remains fully operational. Some of the strategies we use include:

  • Swing Space Optimization: Architects audit the existing facility to identify rooms that can serve multiple purposes during construction. For example, designing an art room or cafeteria expansion during an earlier phase so that these rooms can temporarily serve as classrooms.
  • Utility Demolition Plans: We detail exactly how MEP (mechanical, electrical, plumbing) systems are routed so that existing lines feeding occupied classrooms are not severed when older sections are demolished.

Documenting “Chain of Custody” Egress

Contractors must maintain code-compliant egress, but they can only work with what the architect provides in the Life Safety plans. These plans ensure that, even when a major exit is blocked by a construction fence, the remaining corridors meet maximum travel distance and occupant load requirements. If construction cuts off an exit corridor, we can design a temporary exit door out of an existing classroom window or side wall, providing a safe exit to the outside. By using the site plan to define clear, immovable boundaries for construction staging, heavy equipment paths become entirely separate from parent drop-off loops and student walking paths.

Environmental Control via Specifications

Architects specify mandatory construction barriers (like floor-to-ceiling plastic partitions with negative air pressure machines) and dictate that construction dust cannot enter the active HVAC returns serving students. We specify low-VOC or zero-VOC adhesives, paints, and carpets to meet material off-gassing requirements.

We can also include language in the specifications that explicitly restricts high-decibel activities during standardized testing windows or specific morning instruction hours.

Early Collaborative Delivery Support Process Architecture

Early Collaborative Delivery Support

If the project utilizes a collaborative delivery method like CM/GC (Construction Manager/General Contractor) or Progressive Design-Build, the architect’s role changes dramatically. For example:

  • Pre-Construction Validation: We collaborate with the CM/GC during the schematic design phase to co-author the phasing plan. We bring the code expertise, while the contractor brings the scheduling and logistics expertise.
  • Target Value Design Alignment: Architects adjusts the design details in real-time to match the contractor’s logistical realities, ensuring that the cost of temporary partitions, staging, and night-shift labor is fully factored into the early budget milestones.

And speaking of alternate delivery methods…

They say there’s a time and place for everything and that is certainly the case for bidding strategies. Understanding district priorities, construction scheduling, timeline, and budget is essential for selecting the right delivery method. Below is an info graphic outlining the main components of each alternate project delivery method.

Alternative Design Delivery Methods Process Architecture

Design-Bid-Build

Design-Bid-Build is still the most commonly used delivery method—although we believe that trend is changing.

Hard bid can be beneficial for smaller, straight-forward projects that have longer timelines. One of its advantage is creating a transparent procurement process where contractors bid on the same set of specifications, ensuring districts will receive the lowest possible price for the design. This also means that districts retain absolute control during design before the contractor steps in. Finally, public entities appreciate the linear process with no overlapping design and construction phases to monitor.

But hard bid projects come with some risk because of misaligned documentation, the inherent limitations of 2-D plans, and the absence of a collaborative feedback loop. Detailed drawings cannot capture every site condition, and teams can be forced to resolve plan interpretations retroactively, which can ultimately result in change orders that drive up the budget.

coffee

So, there you have it! We hope we’ve provided you with some food for thought and guidance as you navigate your K-12 projects. Our fingers are crossed that by the time this reaches you, your bond has passed! Check out Part 1 if you missed it!